BillWill Photos

Bill Williams Photos


Home Contact Register Login
Album list Last uploads Last comments Most viewed Top rated My Favourites By date Search
Home > User galleries > Billwill 3 > Billwill 3

EllenBignell.jpg
EllenBignell.jpg4 viewsbillwilladmin
XXX7BCGmembers.jpg
XXX7BCGmembers.jpgBCG Meet Members5 viewsBillwill 3
BlueRose.jpg
BlueRose.jpgBlueRose44 viewsA blue rosebillwilladmin
DSCN5387.JPG
DSCN5387.JPGInterior view of the completed Summerhouse160 viewsBillwill 3
DSCN5386.JPG
DSCN5386.JPGSecond coat, the biuld is complete173 viewsBillwill 3
DSCN5384.JPG
DSCN5384.JPGNearly complete149 viewsThe first coat of Golden Brown preservative has now been painted on all the outside walls.Billwill 3
DSCN5382.JPG
DSCN5382.JPGDoor Sill250 viewsBillwill 3
DSCN5381.JPG
DSCN5381.JPGSkirting board4044 viewsA low skirting board is used to cover gaps at the ends of the floorboardsBillwill 3
DSCN5378.JPG
DSCN5378.JPGAnother storm brace202 viewsBillwill 3
DSCN5377.JPG
DSCN5377.JPGFirst storm brace fitted209 viewsSince the wall logs are slotted together and not fixed to each other there is a faint possibility that very stron winds could lift the whole roof off and have it fly away. The storm braces ensure that the wind would have to list almost all of the walls as well and they are fairly heavy.Billwill 3
DSCN5374.JPG
DSCN5374.JPGFloorboards all fitted319 viewsBillwill 3
DSCN5373.JPG
DSCN5373.JPGFloorboards nearly all fitted323 viewsThe very last one had the be sawn to width to fit using a hand held circular power saw. (not in situ).Billwill 3
DSCN5371.JPG
DSCN5371.JPGFitting floorboards298 viewsBillwill 3
DSCN5369.JPG
DSCN5369.JPGHalf the floorboards fitted.274 viewsI chose to screw down the boards rather than nail them, in case I ever have to lift them up again.Billwill 3
DSCN5367.JPG
DSCN5367.JPGWindows with glass detail.269 viewsBillwill 3
DSCN5366.JPG
DSCN5366.JPGDouble-Glazing fitted275 viewsWith the second coat of preservative on the frames dried; the double-glazing panels have been fitted to windows and doors and the decoarive crosses fitted over the glass.Billwill 3
DSCN5364.JPG
DSCN5364.JPGPainting preservative on the floor boards389 viewsA clear anti-rot, anti-insect preservative was applied to the underside of each of the floorboards Fortunately the summerhouse now keeps the rain off.Billwill 3
DSCN5363.JPG
DSCN5363.JPGDetailed view of the roof trims.378 viewsBillwill 3
DSCN5361.JPG
DSCN5361.JPGRoof complete379 viewsThe roof felt has been fitted and the facia boards on the apex ends fitted and the roof trim along the front and back fitted.
The door and window frames have been given their first coat of preservative. The roof trims have had two coats.
Billwill 3
DSCN5341.JPG
DSCN5341.JPGFront roof boards half completed375 viewsBillwill 3
DSCN5339.JPG
DSCN5339.JPGPreparing for the front roof boards376 viewsBillwill 3
DSCN5340.JPG
DSCN5340.JPGRear roof boards completed380 viewsBillwill 3
DSCN5336.JPG
DSCN5336.JPGFitting the roof boards continued226 viewsBillwill 3
DSCN5335.JPG
DSCN5335.JPGFitting the roof boards.215 viewsWith Nick's help the rest of the walls and the heavy roof beams were fitted but rain stopped play for a day or so, then I started fitting the roof boards at the back part of the summer houseBillwill 3
DSCN5331.JPG
DSCN5331.JPGDdtail of window frame210 viewsBillwill 3
DSCN5329.JPG
DSCN5329.JPGWindow frames fitted.212 viewsThe correct logs were supplied and the walls continued risingBillwill 3
DSCN5327.JPG
DSCN5327.JPGDoorframe fitted7821 viewsWork delayed at this point because some of the supplied logs were the wrong size.Billwill 3
DSCN5326.JPG
DSCN5326.JPGBottom four and a half logs fitted.228 viewsThe door frame is being assembledBillwill 3
DSCN5324.JPG
DSCN5324.JPGAdjustable legs about to be screwed to the lower bearers.223 viewsBillwill 3
DSCN5322.JPG
DSCN5322.JPGChecking the levelling145 viewsBillwill 3
DSCN5319.JPG
DSCN5319.JPGFilling the ground grids with shingle280 viewsThe adjustable legs were first screwed up to all be approximately level Checked with a 6 foot long spirit levelBillwill 3
DSCN5318.JPG
DSCN5318.JPGPlacing the adjustable legs158 viewsBillwill 3
DSCN5312.JPG
DSCN5312.JPGBase grid back on the ground grids to check positions.140 viewsBillwill 3
DSCN5311.JPG
DSCN5311.JPGSetting ground grids.151 viewsThe sledgehammer was used to tamp down the soil.Billwill 3
DSCN5305.JPG
DSCN5305.JPGSetting ground grids into the soil151 viewsBillwill 3
DSCN5304.JPG
DSCN5304.JPGLifting the base grid to dig under it141 viewsLifting like this proved impractical and it was easier to move the whole base grid away to prepare the goound locations.Billwill 3
DSCN5303.JPG
DSCN5303.JPGPositioning the ground grids142 viewsBillwill 3
DSCN5301.JPG
DSCN5301.JPGThe Making of the Base Grid137 viewsBillwill 3
DSCN5300.JPG
DSCN5300.JPGThe Site at the end of the Garden159 viewsBillwill 3
 
39 files on 1 page(s)